Infrastructure in Waterlooville
Waterlooville in South East scores 41/100 (fair) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 95%
- Full fibre
- 69%
- Full fibre by 2028
- 98%
- 4G indoors
- 7%
- 5G coverage
- 6%
- Home energy (EPC)
- D
- Fuel poverty
- 7%
- EV points / 1k
- 0.2
- Development sites
- 7
Data last updated: 19 October 2026