Infrastructure in Paisley
Paisley in Scotland scores 72/100 (very good) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 97%
- Full fibre
- 91%
- Full fibre by 2028
- 99%
- 4G indoors
- 100%
- 5G coverage
- 100%
- Home energy (EPC)
- C
- EV points / 1k
- 0.2
- Development sites
- 57
Data last updated: 15 August 2026