Infrastructure in Leigh

Leigh in North West scores 65/100 (good) for infrastructure, measured against the national average — a score of 60 is typical for the country.

Gigabit-ready
94%
Full fibre
88%
Full fibre by 2028
99%
Home energy (EPC)
D
Fuel poverty
12%
EV points / 1k
0.3
Development sites
41

How we measure this

Data last updated: 19 October 2026

See the full Leigh report

More on Leigh