Infrastructure in Jarrow
Jarrow in North East scores 28/100 (modest) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 87%
- Full fibre
- 32%
- Full fibre by 2028
- 100%
- 5G coverage
- 100%
- Home energy (EPC)
- D
- Fuel poverty
- 10%
- EV points / 1k
- 0.7
- Development sites
- 11
Data last updated: 15 August 2026