Infrastructure in Hillingdon
Hillingdon in London scores 61/100 (good) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 91%
- Full fibre
- 77%
- Full fibre by 2028
- 96%
- Home energy (EPC)
- D
- Fuel poverty
- 10%
- EV points / 1k
- 0.4
- Development sites
- 202
Data last updated: 15 August 2026