Infrastructure in Gloucester
Gloucester in South West scores 48/100 (fair) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 92%
- Full fibre
- 56%
- Full fibre by 2028
- 100%
- Home energy (EPC)
- D
- Fuel poverty
- 9%
- EV points / 1k
- 0.2
- Development sites
- 56
Data last updated: 15 August 2026