Infrastructure in Congleton
Congleton in North West scores 65/100 (good) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 95%
- Full fibre
- 77%
- Full fibre by 2028
- 97%
- 4G indoors
- 100%
- 5G coverage
- 99%
- Home energy (EPC)
- D
- Fuel poverty
- 8%
- EV points / 1k
- 0.0
- Development sites
- 16
Data last updated: 15 August 2026