Infrastructure in Bedworth
Bedworth in West Midlands scores 54/100 (fair) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 86%
- Full fibre
- 69%
- Full fibre by 2028
- 100%
- Home energy (EPC)
- D
- Fuel poverty
- 11%
- EV points / 1k
- 0.2
- Development sites
- 36
Data last updated: 15 August 2026