Infrastructure in Bangor
Bangor in Wales scores 54/100 (fair) for infrastructure, measured against the national average — a score of 60 is typical for the country.
- Gigabit-ready
- 78%
- Full fibre
- 71%
- Full fibre by 2028
- 90%
- 4G indoors
- 98%
- 5G coverage
- 84%
- Home energy (EPC)
- D
- EV points / 1k
- 0.3
Welsh fuel-poverty estimates are modelled at council level only and aren't shown.
Wales has no brownfield land register.
Data last updated: 19 October 2026